Motorists are advised to expect delays on Highway 169 in St. Peter, Highway 111 in Nicollet and Highway 60 between Butterfield and St. James beginning the week of August 10, weather permitting, as crews apply a seal coat.

The maintenance work on Highway 169 in St. Peter will result in a lane closure from Union Street to Dodd Avenue (Highway 22) for several days.  Only a small section of Highway 111 in Nicollet will be impacted.  Motorists on the five mile section on Highway 60 from Butterfield to the west side of St. James should anticipate lane closures during operations. All three highway segments should be completed in about two weeks.

Traffic will be controlled with flaggers and a pilot car.  Motorists should slow down, drive with caution and watch for workers, equipment and traffic control devices.