MnDot says work will continue on the Highway 14/15 Minnesota River Bridge in New Ulm into December. MnDOT says the bridge deck and railings on both sides of the traffic lanes are complete, but the more time-consuming aspect of the project will be the decorative outside pedestrian railing. MnDOT says the goal is to open the bridge to traffic by the end of the year with finishing work scheduled for the spring.